81. Article
   CONCEPTION, CONSTRUCTION ET MISE EN SERVICE D'UN NOUVEAU FOUR VERTICAL A PLUSIEURS CHAMBRES AVEC ASPIRATION D'AIR CHAUD DANS UNE CHAUFOURNERIE OUEST-ALLEMANDE / LAYOUT, ERECTION AND COMMISSIONING OF THE NEW MULTI-CHAMBER SHAFT KILN WITH HOT-AIR EXTRACTION INSTALLED AT A LIME FACTORY IN FRG / PLANUNG, BAU UND INBETRIEBNAHME DES NEUEN MEHRKAMMERSCHACHTOFENS MIT HEISSLUFTABSAUGUNG IN EINEM WESTDEUTSCHEN KALKWERK; Réf. ATILH n°24337 - ZEISEL P. - LEWERENZ D. - 1987 -

82. Article
   CONCEPTION, CONSTRUCTION ET MISE EN SERVICE D'UNE INSTALLATION DE FOURS A CHAUX VERTICAUX DE 2 X 300 T/JOUR / DESIGN, CONSTRUCTION ET COMMISSIONING OF A 2 X 300 T/D LIME SHAFT KILN PLANT / PLANUNG, BAU UND INBETRIEBNAHME EINER 2 X 300 T/D -KALKSCHACHTOFEN-ANLAGE; Réf. ATILH n°20318 - MAILAENDER H. - RAZA S. - LUGER W. - 1984 -

83. Acte de Congrès
   CONCEPTION D'UNE CIMENTERIE EN VUE D'UNE FAIBLE CONSOMMATION D'ENERGIE / CEMENT PLANT DESIGN FOR LOW POWER CONSUMPTION / AUSLEGUNG DES ZEMENTWERKS FUER NIEDRIGEN ENERGIEVERBRAUCH; Réf. ATILH n°17650 - FRANCIS EF. - 1981 -

84. Article
   CONCEPTION ET CONSTRUCTION D'UNE NOUVELLE CIMENTERIE DE 500 000 T/A A GLADSTONE/AUSTRALIE / ENGINEERING AND CONSTRUCTION OF A NEW 500 000 T/A CLINKER PLANT AT GLADSTONE/AUSTRALIA / PROJEKTIERUNG UND BAU EINES NEUEN 500 000 T/A KLINKERWERKES IN GLADSTONE/AUSTRALIEN; Réf. ATILH n°14319 - WUERMLI H. - 1980 -

85. Article
   CONCEPTION ET MISE EN MARCHE D'UN SYSTEME DE PILOTAGE MODERNE A LA CIMENTERIE DE VICTORVILLE EN CALIFORNIE / DESIGN AND COMMISSIONING OF A MODERN CONTROL SYSTEM IN THE VICTORVILLE CEMENT WORKS, CALIFORNIA / PLANUNG UND INBETRIEBNAHME EINES MODERNEN LEITSYSTEMS IM ZEMENTWERK VICTORVILLE, KALIFORNIEN; Réf. ATILH n°21115 - GRUENBERG WD. - HOLTSCHNEIDER F. - 1985 -

86. Article
   CONCEPTION ET REALISATION DE LA CIMENTERIE DE 4500 T-J DE QUATTAMIA, EGYPTE / PLANNING AND EXECUTION OF 4500 TPD QUATTAMIA PLANT, EGYPT; Réf. ATILH n°25208 - JANSEN MH. - 1988 -

87. Thèse
   CONCEPTION ET REALISATION D'UN PERMEABILIMETRE AUTOMATIQUE POUR LES BETONS ET LES MORTIERS / CONCEPTION AND CARRYING OUT OF AN AUTOMATIC PERMEABILIMETER FOR CONCRETES AND MORTARS / AUSLEGUNG UND VERWIRKLICHUNG EINES AUTOMATISCHEN DURCHLAESSIGKEITS-MESSGERAETS FUER BETONE UND MOERTEL; Réf. ATILH n°22805 - MORAL M. - PELATAN A. - 1986 -

88. Article
   CONCEPTION, FONCTIONNEMENT ET RESULTATS D'EXPLOITATION DU PROCEDE DE PRECALCINATION ZAB-PASEC / CONSTRUCTION FEATURES, OPERATING AND EXPERIENCE WITH THE ZAB-PASEC PRECALCINING PROCESS / AUFBAU, FUNKTION UND BETRIEBSERGEBNISSE DES AB-PASEC -VORKALZINIERVERFAHRENS; Réf. ATILH n°23577 - SCHWERDTFEGER I. - 1986 -

89. Article
   CONCEPTION TECHNIQUE DE LA CIMENTERIE DEUNA DE LA VEB EICHSFELDER; Réf. ATILH n°09466 - FEIGE F. - 1976 -

90. Article
   CONSERVATION DE L'ENERGIE A OSAKA CEMENT / ENERGY CONSERVATION AT OSAKA CEMENT / ENERGIEWIRTSCHAFT BEI OSAKA CEMENT; Réf. ATILH n°14454 - SAKAMOTO S. - KAWATA T. - 1980 -

91. Article
   Construction de ponts en Norvège. Situation actuelle et développements futurs / Bridge construction in Norway. Status and development tendencies / Brubygging i Norge. Status og utvikligstendenser; Réf. ATILH n°27316 - ODERUD HT. - 1989 -

92. Article
   CONSTRUCTION DES CENTRALES THERMIQUES KELLERBERG ET PATERNION. ECONOMIES GRACE A L'EXECUTION DES TRAVAUX EN CONTINU / CONSTRUCTION OF THE THERMAL POWER PLANTS KELLERBERG AND PATERNION. SAVINGS WITH CONTINUOUS BUILDING / KRAFTWERKSBAU KELLERBERG-PATERNION. EINSPARUNGEN BEI EINER KONTINUIERLICHEN BAUAUSFUEHRUNG; Réf. ATILH n°25407 - CICHOCKI B. - 1988 -

93. Article
   CONSTRUCTION D'UNE CIMENTERIE AU PARAGUAY / CONSTRUCTION OF A CEMENT PLANT IN PARAGUAY; Réf. ATILH n°24572 - ROYER S. - BOUCHOU A. - GRUAU C. - 1987 -

94. Article
   CONSTRUCTION D'UNE CIMENTERIE D'UNE CAPACITE DE 1 MT/AN A ENFIDA/TUNISIE / CONSTRUCTION OF A MIO T/A CEMENT PLANT IN ENFIDA/TUNESIA / BAU EINES 1-MIO-T/A-ZEMENTWERKES IN ENFIDA/TUNESIEN; Réf. ATILH n°20093 - LEUZINGER P. - 1984 -

95. Article
   CONSTRUCTION D'UNE LIGNE AUTOMATISEE DE 4 700 T/J A LA CIMENTERIE DE SLITE/SUEDE / ERRICHTUNG EINER AUTOMATISIERTEN 4 700 T WERK SLITE/SCHWEDEN; Réf. ATILH n°12078 - MUENCH W. - DREYER D. - 1978 -

96. Article
   CONSTRUCTION D'UNE NOUVELLE LIGNE DE PRODUCTION DE CLINKER A ANTOING, BELGIQUE / CONSTRUCTION OF NEW CLINKER PRODUCTION LINE AT ANTOING, BELGIUM / BAU EINER NEUEN KLINKERBRENNANLAGE IN ANTOING, BELGIEN; Réf. ATILH n°22303 - HELLOFS Léonard - 1985 -

97. Article
   CONSTRUCTION D'UNE NOUVELLE LIGNE DE PRODUCTION DE CLINKER A ANTOING, BELGIQUE / CONSTRUCTION OF NEW CLINKER PRODUCTION LINE AT ANTOING, BELGIUM / BAU EINER NEUEN KLINKERPRODUKTIONSLINIE IN ANTOING, BELGIEN; Réf. ATILH n°21034 - HELLOFS L. - 1985 -

98. Article
   CONSTRUCTION EN BLOCS DE TERRE. LE PROCEDE PACT / BUILDING WITH SOIL BLOCKS. THE PACT METHOD / BAUEN MIT BLOECKEN AUS ERDE. DAS PACT-VERFAHREN; Réf. ATILH n°21499 - 1985 -

99. Article
   CONSTRUCTION ET MISE EN SERVICE D'UN FOUR MODERNE D'UNE CAPACITE DE 2000 T/J A L'USINE DUDFIELD DE LA ANGLO-ALPHA CEMENT EN AFRIQUE DU SUD / ANGLO-ALPHA CEMENT COMMISSIONS A MODERN 2000 TON PER DAY AT DUDFIELD, SOUTH AFRICA / BAU UND INBETRIEBNAHME EINER MODERNEN 2000 T- OFENANLAGE DER ANGLO-ALPHA ZEMENT, WERK DUDFIELD, SUEDAFRIKA; Réf. ATILH n°12946 - EISENRING R. - LEVY G. - 1979 -

100. Article
   CONSTRUCTION ET POSSIBILITES D'EMPLOI D'UN CALORIMETRE DIFFERENTIEL / DESIGN AND APPLICATION OF A DIFFERENTIAL CALORIMETER / AUFBAU UND EINSATZMOEGLICHKEITEN EINES DIFFERENTIALKALORIMETERS; Réf. ATILH n°15874 - WIEKER W. - OLIEW G. - 1981 -